The work starts tomorrow...
All going to plan.
These photos show:
The back of my bus.
This is where the big cargo box is going.
It will be slightly higher that the white paint area. The width will be past the lights and shaped to match the shape of the bus.
The lights will be relocated to the back or side of the box and access to the fresh water tank will probably have a hose extension on it somehow.
The second photo is the side of my bus where the drop down table is going - from the door to the vents which are the fridge vents.
It will be attached just above the lockers and fold up along the side.
It will drop down on chains at both ends.
It will be aluminium frame with wooden slats.
The third photo is the door. It will be cut in half, probably just above the handle.
The bottom half will have three folded sheets of aluminium to make three sides of a shower box, the door making the 4th side if needed.
This will make an outside shower which will work from a big pot of water with a bilge pump with a shower head on it.
Watch this space for developments and more photos...
No comments:
Post a Comment